ITAC Assessment: OK1047
ITAC logo
ITAC Assessment: OK1047
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Livestock Feeds
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 38
Plant Area 75,000
ft2
Annual Production 94,000
ton
Production Hrs. Annual 5,616
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $348,512 4,356,400
kWh
Electricity Demand $41,695 15,914
kW-mo/yr
Natural Gas $19,491 2,994
MMBtu
Waste Disposal Costs
Water Usage $1,394 335
Tgal
TOTAL YEARLY COSTS $411,092
RECOMMENDED SAVINGS* $21,043 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,043

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4133: Use most efficient type of electric motors $9,181 $17,737 $9,181
114,768
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,774 $6,045 $5,397
67,459
kWh
$377
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,212 $1,242 $5,212
65,146
kWh
-
04 2.7232: Replace existing hvac unit with high efficiency model $876 $500 $876
10,944
kWh
-
TOTAL RECOMMENDED $21,043 $25,524 $20,666
258,317
kWh
$377
-
kW-mo/yr
TOTAL IMPLEMENTED $21,043 $25,524 $20,666
258,317
kWh
$377
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs