ITAC Assessment: LT0085
ITAC logo
ITAC Assessment: LT0085
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PLASTIC CONTAINERS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area
n/a
Annual Production 2,150,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,207 856,975
kWh
Natural Gas $58,305 15,140
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,493 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $393

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $23,100 $2,000 - $23,100
-
MMBtu
02 2.1131: Repair faulty insulation in furnaces, boilers, etc $290 $333 - $290
-
MMBtu
03 2.4133: Use most efficient type of electric motors $103 $202 $103
1,758
kWh
-
TOTAL RECOMMENDED $23,493 $2,535 $103
1,758
kWh
$23,390
-
MMBtu
TOTAL IMPLEMENTED $393 $535 $103
1,758
kWh
$290
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs