ITAC Assessment: CW0113
ITAC logo
ITAC Assessment: CW0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Injection Molding for Gas, Automotive, Health and Beauty
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 50,000
ft2
Annual Production 4
ton
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,869 2,994,746
kWh
Electricity Demand $54,083 6,678
kW-mo/yr
Electricity Fees $2,856 -
Natural Gas $1,458 271
MMBtu
Waste Disposal Costs
Water Usage $1,356 260
Tgal
Water Disposal $1,483 250
Tgal
TOTAL YEARLY COSTS $232,105
RECOMMENDED SAVINGS* $140,647 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,772

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Primary Product Savings
01 2.2691: Shut off cooling if cold outside air will cool process $3,565 $1,858 $3,565
62,544
kWh
- - -
02 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $104,454 $200,550 $10,602
186,017
kWh
$(-10,965.0)
-
kW-mo/yr
- $104,817
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $941 $105 $941
16,515
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $656 $810 $656
11,502
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $583 $1,600 $583
10,235
kWh
- - -
06 2.3212: Optimize plant power factor $13,673 $2,250 - - $13,673 -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $13,683 $10,280 $9,846
172,737
kWh
$2,935
-
kW-mo/yr
$902 -
08 2.2511: Insulate bare equipment $3,092 $1,969 $3,092
54,250
kWh
- - -
TOTAL RECOMMENDED $140,647 $219,422 $29,285
513,800
kWh
$(-8,030.0)
-
kW-mo/yr
$14,575 $104,817
TOTAL IMPLEMENTED $18,772 $13,843 $14,935
262,031
kWh
$2,935
-
kW-mo/yr
$902 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs