ITAC Assessment: AS0616
ITAC logo
ITAC Assessment: AS0616
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Glass substrates
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $1
M
to 5
M
# of Employees 62
Plant Area 35,000
ft2
Annual Production 200,000
units
Production Hrs. Annual 3,024
hrs
Location (State) New Mexico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,914 3,838,200
kWh
Electricity Demand $187,288 7,074
kW-mo/yr
Electricity Fees $59,011 -
Natural Gas $30,439 5,308
MMBtu
Other Energy $4,176 1
MMBtu
TOTAL YEARLY COSTS $456,828
RECOMMENDED SAVINGS* $34,830 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $31,386 $2,448 - - $31,386 - -
02 2.7226: Use computer programs to optimize hvac performance $1,135 $2,744 $98
2,131
kWh
$479
-
kW-mo/yr
- $558
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $877 $3,742 $268
5,854
kWh
$581
-
kW-mo/yr
- - $28
04 2.7135: Install occupancy sensors $552 $1,643 $175
3,822
kWh
$377
-
kW-mo/yr
- - -
05 2.7272: Install heat pipes / raise cooling setpoint $488 $86 $99
2,157
kWh
$389
-
kW-mo/yr
- - -
06 2.4221: Install compressor air intakes in coolest locations $330 $770 $184
4,021
kWh
$146
-
kW-mo/yr
- - -
07 2.7132: Install timers on light switches in little used areas $62 $255 $62
1,359
kWh
- - - -
TOTAL RECOMMENDED $34,830 $11,688 $886
19,344
kWh
$1,972
-
kW-mo/yr
$31,386 $558
-
MMBtu
$28
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs