ITAC Assessment: OK1166
ITAC logo
ITAC Assessment: OK1166
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product semiconductor manufacturing chemicals
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 55,000
ft2
Annual Production 77
ton
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,248 2,004,900
kWh
Electricity Demand $67,754 5,034
kW-mo/yr
Natural Gas $38,947 6,557
MMBtu
Waste Disposal Costs
Water Usage $1,752 330
Tgal
Water Disposal $4,415 330
Tgal
TOTAL YEARLY COSTS $247,116
RECOMMENDED SAVINGS* $79,850 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $21,807 $205,920 $21,807
325,476
kWh
- - -
02 2.7135: Install occupancy sensors $3,857 $1,610 $3,857
57,567
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,304 $2,574 $1,304
19,460
kWh
- - -
04 2.3212: Optimize plant power factor $953 $5,076 - - - $953
05 2.2622: Replace existing chiller with high efficiency model $37,309 $136,434 $17,281
257,920
kWh
$20,028
-
kW-mo/yr
- -
06 2.7211: Clean and maintain refrigerant condensers and towers $1,931 $3,816 $1,931
28,828
kWh
- - -
07 2.7226: Use computer programs to optimize hvac performance $6,219 $55,000 $6,219
92,821
kWh
- - -
08 2.7261: Install timers and/or thermostats $4,307 $3,800 - - $4,307
-
MMBtu
-
09 2.6211: Conserve energy by efficient use of vending machines $377 $450 $377
5,641
kWh
- - -
10 2.7492: Use proper thickness of insulation on building envelope $1,786 $45,790 $782
11,665
kWh
- $1,004
-
MMBtu
-
TOTAL RECOMMENDED $79,850 $460,470 $53,558
799,378
kWh
$20,028
-
kW-mo/yr
$5,311
-
MMBtu
$953
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs