Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,733

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Semiconductor and other electronic component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0616 #07 Y:2026 Install timers on light switches in little used areas $62 $255
AS0616 #06 Y:2026 Install compressor air intakes in coolest locations $330 $770
AS0616 #05 Y:2026 Install heat pipes / raise cooling setpoint $488 $86
AS0616 #04 Y:2026 Install occupancy sensors $552 $1,643
AS0616 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $877 $3,742
AS0616 #02 Y:2026 Use computer programs to optimize hvac performance $1,135 $2,744
AS0616 #01 Y:2026 Change rate schedules or other changes in utility service $31,386 $2,448
SF0648 #06 Y:2026 Adopt in-house material generation $41,495 $54,725
SF0648 #05 Y:2026 Use battery storage for demand control $25,681 $73,820
SF0648 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $24,382 $32,268
SF0648 #03 Y:2026 Use computer programs to optimize hvac performance $5,174 $2,069
SF0648 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,247 -
SF0648 #01 Y:2026 Turn off equipment when not in use $31,876 -
OK1166 #09 Y:2026 Conserve energy by efficient use of vending machines $377 $450
OK1166 #08 Y:2026 Install timers and/or thermostats $4,307 $3,800
OK1166 #07 Y:2026 Use computer programs to optimize hvac performance $6,219 $55,000
OK1166 #06 Y:2026 Clean and maintain refrigerant condensers and towers $1,931 $3,816
OK1166 #05 Y:2026 Replace existing chiller with high efficiency model $37,309 $136,434
OK1166 #04 Y:2026 Optimize plant power factor $953 $5,076