146
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Industrial truck, tractor, trailer, and stacker machinery manufacturing | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
GT0982 #07 Y:2024 | 07 | 2024 | Use solar heat to make electricty | $67,468 | $877,960 |
n/a
|
GT0982 #06 Y:2024 | 06 | 2024 | Install vinyl strip / high speed / air curtain doors | $5,851 | $12,950 |
n/a
|
GT0982 #05 Y:2024 | 05 | 2024 | Reduce the pressure of compressed air to the minimum required | $923 | $800 |
n/a
|
GT0982 #04 Y:2024 | 04 | 2024 | Eliminate or reduce compressed air usage | $1,571 | $1,100 |
n/a
|
GT0982 #03 Y:2024 | 03 | 2024 | Conserve energy by efficient use of vending machines | $194 | $135 |
n/a
|
GT0982 #02 Y:2024 | 02 | 2024 | Reduce space conditioning during non-working hours | $2,144 | $1,200 |
n/a
|
GT0982 #01 Y:2024 | 01 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $19,510 | $1,850 |
n/a
|
UD1084 #06 Y:2024 | 06 | 2024 | Utilize higher efficiency lamps and/or ballasts | $1,134 | $3,775 |
n/a
|
UD1084 #05 Y:2024 | 05 | 2024 | Install occupancy sensors | $1,251 | $3,985 |
n/a
|
UD1084 #04 Y:2024 | 04 | 2024 | Re-use or recycle hot or cold process exhaust air | $47,804 | $143,413 |
n/a
|
UD1084 #03 Y:2024 | 03 | 2024 | Meter recycled water (to reduce sewer charges) | $3,871 | $6,080 |
n/a
|
UD1084 #02 Y:2024 | 02 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,258 | $1,235 |
n/a
|
UD1084 #01 Y:2024 | 01 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $1,386 | - |
n/a
|
UU0247 #05 Y:2024 | 05 | 2024 | Utilize higher efficiency lamps and/or ballasts | $864 | $7,540 |
n/a
|
UU0247 #04 Y:2024 | 04 | 2024 | Use waste heat from hot flue gases to preheat incoming fluids | $1,060 | $1,950 |
n/a
|
UU0247 #03 Y:2024 | 03 | 2024 | Use optimum size and capacity equipment | $200,000 | $717,040 |
n/a
|
UU0247 #02 Y:2024 | 02 | 2024 | Recover waste heat from equipment | $1,770 | $9,500 |
n/a
|
UU0247 #01 Y:2024 | 01 | 2024 | Turn off equipment when not in use | $5,970 | $3,000 |
n/a
|
UD1082 #10 Y:2024 | 10 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $245 | - |
n/a
|
UD1082 #09 Y:2024 | 09 | 2024 | Utilize controls to operate equipment only when needed | $3,739 | $18,600 |
n/a
|