ITAC Assessment: UD1082
ITAC logo
ITAC Assessment: UD1082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Lift truck attachments, forks, and accessories
NAICS 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 200,000
ft2
Annual Production 74,700
units
Production Hrs. Annual 4,800
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $245,403 4,192,350
kWh
Electricity Demand $58,273 10,400
kW-mo/yr
Electricity Fees $3,840 -
Natural Gas $153,002 21,685
MMBtu
Other Gas $2,105 1
MMBtu
Waste Disposal Costs
Water Usage $3,769 839
Tgal
Water Disposal $7,801 839
Tgal
Other Liquid (non-haz) $6,232 1
gal
Other Liquid (haz) $23,617 36
gal
TOTAL YEARLY COSTS $504,042
RECOMMENDED SAVINGS* $106,510 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,232 $1,235 $3,635
62,142
kWh
$597
-
kW-mo/yr
- - - - -
02 3.4116: Meter recycled water (to reduce sewer charges) $4,315 $760 - - - $4,315
-
Tgal
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,327 $9,308 $7,256
124,030
kWh
$2,440
-
kW-mo/yr
$10,631
-
MMBtu
- - - -
04 2.6218: Turn off equipment when not in use $35,677 - - - $12,060
-
MMBtu
- $23,617
-
gal
- -
05 2.2314: Replace heat treating oven with more efficient unit $20,600 $93,250 $(-8,510.0)
(-145,477)
kWh
$(-2,307.0)
-
kW-mo/yr
$31,417
-
MMBtu
- - - -
06 2.6218: Turn off equipment when not in use $12,369 - - - $12,369
-
MMBtu
- - - -
07 2.7135: Install occupancy sensors $1,431 $2,001 $963
16,459
kWh
- - - - $57 $411
08 2.7491: Insulate glazing, walls, ceilings, and roofs $3,575 $11,626 - - $3,575
-
MMBtu
- - - -
09 2.6231: Utilize controls to operate equipment only when needed $3,739 $18,600 $3,739
63,917
kWh
- - - - - -
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $245 - $206
3,520
kWh
$39
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $106,510 $136,780 $7,289
124,591
kWh
$769
-
kW-mo/yr
$70,052
-
MMBtu
$4,315
-
Tgal
$23,617
-
gal
$57 $411
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs