Assessment Year 2024
Principal Product Lift truck attachments, forks, and accessories
NAICS 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $10
M
to 50
M
# of Employees 74
Plant Area 60,000
ft2
Annual Production 216,446
units
Production Hrs. Annual 6,288
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $389,050 6,583,920
kWh
Electricity Demand $321,399 20,781
kW-mo/yr
Electricity Fees $3,266 -
Natural Gas $211,683 39,027
MMBtu
Waste Disposal Costs
Water Usage $8,069 2,176
Tgal
Water Disposal $6,884 2,176
Tgal
Other Liquid (non-haz) $675 1
gal
TOTAL YEARLY COSTS $941,026
RECOMMENDED SAVINGS* $56,704 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,386 - $936
15,840
kWh
$450
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,258 $1,235 $1,258
21,293
kWh
- - - - -
03 3.4116: Meter recycled water (to reduce sewer charges) $3,871 $6,080 - - - $3,871
-
Tgal
- -
04 2.2443: Re-use or recycle hot or cold process exhaust air $47,804 $143,413 - - $47,804
-
MMBtu
- - -
05 2.7135: Install occupancy sensors $1,251 $3,985 $892
15,091
kWh
- - - $72 $287
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,134 $3,775 $348
5,895
kWh
$438
-
kW-mo/yr
- - $338 $10
TOTAL RECOMMENDED $56,704 $158,488 $3,434
58,119
kWh
$888
-
kW-mo/yr
$47,804
-
MMBtu
$3,871
-
Tgal
$410 $297
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs