Assessment Year | 2004 |
---|---|
Principal Product | aircraft parts |
NAICS | 336411: Aircraft Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 276 |
Plant Area |
232,000
ft2
|
Annual Production | 291,500
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $124,423 | 5,737,240 |
kWh
|
$0.022 |
Electricity Demand | $77,879 | 12,584 |
kW-mo/yr
|
$6.19 |
Electricity Fees | $28,560 | - |
|
- |
Natural Gas | $59,383 | 11,754 |
MMBtu
|
$5.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,062 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,158 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $3,202 | $13,200 |
$(-642.0)
(-27,502)
kWh
|
$3,844
-
kW-mo/yr
|
- | |
02 | 2.4239: Eliminate or reduce compressed air usage | $5,695 | $4,800 |
$87
3,741
kWh
|
$5,608
-
kW-mo/yr
|
- | |
03 | 2.4112: Install soft-start to eliminate nuisance trips | $5,059 | $4,000 |
$613
26,253
kWh
|
$4,446
-
kW-mo/yr
|
- | |
04 | 2.6242: Minimize operation of equipment maintained in standby condition | $3,047 | $2,600 |
$3,047
130,500
kWh
|
- | - | |
05 | 2.2511: Insulate bare equipment | $309 | $723 |
$223
9,534
kWh
|
$86
-
kW-mo/yr
|
- | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,853 | - | - |
$2,853
-
kW-mo/yr
|
- | |
07 | 2.8114: Change rate schedules or other changes in utility service | $4,897 | $200 | - | - | $4,897 | |
TOTAL RECOMMENDED | $25,062 | $25,523 |
$3,328
142,526
kWh
|
$16,837
-
kW-mo/yr
|
$4,897 | ||
TOTAL IMPLEMENTED | $13,158 | $17,400 |
$(-29.0)
(-1,249)
kWh
|
$8,290
-
kW-mo/yr
|
$4,897 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs