ITAC Assessment: RU0113
ITAC logo
ITAC Assessment: RU0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product AEROSPACE FASTENERS
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area
n/a
Annual Production 12,000,000
pieces
Production Hrs. Annual 4,732
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $561,171 7,080,891
kWh
Natural Gas $96,838 17,708
MMBtu
Fuel Oil #4 $115,249 24,124
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,553 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,553

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #4 Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,496 - $3,496
44,256
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $1,138 $330 $1,138
14,361
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,196 $1,735 $7,196
91,149
kWh
- -
04 2.2514: Cover open tanks $506 $1,164 - $506
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,454 - $2,454
31,067
kWh
- -
06 2.2614: Use cooling tower or economizer to replace chiller cooling $17,916 $11,500 $17,916
226,846
kWh
- -
07 2.1233: Analyze flue gas for proper air/fuel ratio $8,091 $500 - - $8,091
-
MMBtu
08 2.2414: Use waste heat from hot flue gases to preheat $13,756 $6,800 - - $13,756
-
MMBtu
TOTAL RECOMMENDED $54,553 $22,029 $32,200
407,679
kWh
$506
-
MMBtu
$21,847
-
MMBtu
TOTAL IMPLEMENTED $54,553 $22,029 $32,200
407,679
kWh
$506
-
MMBtu
$21,847
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #4 Savings