ITAC Assessment: IA0470
ITAC logo
ITAC Assessment: IA0470
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Tension Fabric Buildings
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 269,450
ft2
Annual Production 37,197,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,788 1,880,700
kWh
Electricity Demand $71,263 4,920
kW-mo/yr
Electricity Fees $8,467 -
Natural Gas $89,095 15,672
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,843 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,212

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $1,446 $2,556 $1,446
36,392
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $29,520 $63,232 $17,341
436,800
kWh
$12,179
-
kW-mo/yr
-
03 2.7134: Use photocell controls $208 $210 $208
5,242
kWh
- -
04 2.7314: Reduce ventilation air $1,038 $144 - - $1,038
-
MMBtu
05 2.7447: Install vinyl strip / high speed / air curtain doors $7,631 $15,000 - - $7,631
-
MMBtu
TOTAL RECOMMENDED $39,843 $81,142 $18,995
478,434
kWh
$12,179
-
kW-mo/yr
$8,669
-
MMBtu
TOTAL IMPLEMENTED $32,212 $66,142 $18,995
478,434
kWh
$12,179
-
kW-mo/yr
$1,038
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs