matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
LE0593 #08 Y:2024 | 08 | 2024 | Utilize higher efficiency lamps and/or ballasts | $727 | $3,014 |
n/a
|
LE0593 #07 Y:2024 | 07 | 2024 | Install occupancy sensors | $133 | $479 |
n/a
|
LE0593 #06 Y:2024 | 06 | 2024 | Replace existing hvac unit with high efficiency model | $7,077 | $35,157 |
n/a
|
LE0593 #05 Y:2024 | 05 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $6,724 | $13,069 |
n/a
|
LE0593 #04 Y:2024 | 04 | 2024 | Install compressor air intakes in coolest locations | $1,704 | $4,000 |
n/a
|
LE0593 #03 Y:2024 | 03 | 2024 | Preheat combustion air with waste heat | $15,667 | $20,000 |
n/a
|
LE0593 #02 Y:2024 | 02 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,196 | $1,640 |
n/a
|
LE0593 #01 Y:2024 | 01 | 2024 | Install timers and/or thermostats | $19,297 | - |
n/a
|
GT0982 #07 Y:2024 | 07 | 2024 | Use solar heat to make electricty | $67,468 | $877,960 |
n/a
|
GT0982 #06 Y:2024 | 06 | 2024 | Install vinyl strip / high speed / air curtain doors | $5,851 | $12,950 |
n/a
|
GT0982 #05 Y:2024 | 05 | 2024 | Reduce the pressure of compressed air to the minimum required | $923 | $800 |
n/a
|
GT0982 #04 Y:2024 | 04 | 2024 | Eliminate or reduce compressed air usage | $1,571 | $1,100 |
n/a
|
GT0982 #03 Y:2024 | 03 | 2024 | Conserve energy by efficient use of vending machines | $194 | $135 |
n/a
|
GT0982 #02 Y:2024 | 02 | 2024 | Reduce space conditioning during non-working hours | $2,144 | $1,200 |
n/a
|
GT0982 #01 Y:2024 | 01 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $19,510 | $1,850 |
n/a
|
OK1118 #07 Y:2024 | 07 | 2024 | Replace existing hvac unit with high efficiency model | $4,952 | $9,900 |
n/a
|
OK1118 #06 Y:2024 | 06 | 2024 | Install vinyl strip / high speed / air curtain doors | $2,488 | $25,000 |
n/a
|
OK1118 #05 Y:2024 | 05 | 2024 | Insulate glazing, walls, ceilings, and roofs | $11,355 | $382,780 |
n/a
|
OK1118 #04 Y:2024 | 04 | 2024 | Optimize plant power factor | $816 | $4,683 |
n/a
|
OK1118 #03 Y:2024 | 03 | 2024 | Combine utility meters | $453 | $2,200 |
n/a
|