Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Mechanical power transmission equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0845 #07 Y:2022 Turn off equipment during breaks, reduce operating time $3,762 $505
MA0845 #06 Y:2022 Insulate bare equipment $6,066 $2,910
MA0845 #05 Y:2022 Adjust vents to minimize energy use $8,349 $10,667
MA0845 #04 Y:2022 Turn off equipment during breaks, reduce operating time $10,754 $14,292
MA0845 #03 Y:2022 Replace electrically-operated equipment with fossil fuel equipment $13,709 $182,139
MA0845 #02 Y:2022 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $26,668 $60,000
MA0845 #01 Y:2022 Use solar heat to make electricty $108,785 $906,122
MA0616 #06 Y:2007 Use optimum size and capacity equipment $709 $300
MA0616 #05 Y:2007 Install timers and/or thermostats $16,346 $1,088
MA0616 #04 Y:2007 Recover waste heat from equipment $37,450 $12,998
MA0616 #03 Y:2007 Install compressor air intakes in coolest locations $5,603 $2,550
MA0616 #02 Y:2007 Reduce the pressure of compressed air to the minimum required $6,128 $3,725
MA0616 #01 Y:2007 Utilize higher efficiency lamps and/or ballasts $21,636 $132,834
MA0611 #09 Y:2006 Install vinyl strip / high speed / air curtain doors $504 $3,600
MA0611 #08 Y:2006 Utilize higher efficiency lamps and/or ballasts $888 $6,305
MA0611 #07 Y:2006 Insulate bare equipment $3,330 $3,300
MA0611 #06 Y:2006 Repair furnaces and oven doors so that they seal efficiently $3,833 $5,368
MA0611 #05 Y:2006 Use optimum temperature $6,194 $12,675
MA0611 #04 Y:2006 Replace electrically-operated equipment with fossil fuel equipment $7,443 $17,876
MA0611 #03 Y:2006 Reduce ventilation air $23,954 $17,587