22
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Mechanical power transmission equipment manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MA0845 #07 Y:2022 | 07 | 2022 | Turn off equipment during breaks, reduce operating time | $3,762 | $505 | |
| MA0845 #06 Y:2022 | 06 | 2022 | Insulate bare equipment | $6,066 | $2,910 | |
| MA0845 #05 Y:2022 | 05 | 2022 | Adjust vents to minimize energy use | $8,349 | $10,667 | |
| MA0845 #04 Y:2022 | 04 | 2022 | Turn off equipment during breaks, reduce operating time | $10,754 | $14,292 | |
| MA0845 #03 Y:2022 | 03 | 2022 | Replace electrically-operated equipment with fossil fuel equipment | $13,709 | $182,139 | |
| MA0845 #02 Y:2022 | 02 | 2022 | Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $26,668 | $60,000 | |
| MA0845 #01 Y:2022 | 01 | 2022 | Use solar heat to make electricty | $108,785 | $906,122 | |
| MA0616 #06 Y:2007 | 06 | 2007 | Use optimum size and capacity equipment | $709 | $300 | |
| MA0616 #05 Y:2007 | 05 | 2007 | Install timers and/or thermostats | $16,346 | $1,088 | |
| MA0616 #04 Y:2007 | 04 | 2007 | Recover waste heat from equipment | $37,450 | $12,998 | |
| MA0616 #03 Y:2007 | 03 | 2007 | Install compressor air intakes in coolest locations | $5,603 | $2,550 | |
| MA0616 #02 Y:2007 | 02 | 2007 | Reduce the pressure of compressed air to the minimum required | $6,128 | $3,725 | |
| MA0616 #01 Y:2007 | 01 | 2007 | Utilize higher efficiency lamps and/or ballasts | $21,636 | $132,834 | |
| MA0611 #09 Y:2006 | 09 | 2006 | Install vinyl strip / high speed / air curtain doors | $504 | $3,600 | |
| MA0611 #08 Y:2006 | 08 | 2006 | Utilize higher efficiency lamps and/or ballasts | $888 | $6,305 | |
| MA0611 #07 Y:2006 | 07 | 2006 | Insulate bare equipment | $3,330 | $3,300 | |
| MA0611 #06 Y:2006 | 06 | 2006 | Repair furnaces and oven doors so that they seal efficiently | $3,833 | $5,368 | |
| MA0611 #05 Y:2006 | 05 | 2006 | Use optimum temperature | $6,194 | $12,675 | |
| MA0611 #04 Y:2006 | 04 | 2006 | Replace electrically-operated equipment with fossil fuel equipment | $7,443 | $17,876 | |
| MA0611 #03 Y:2006 | 03 | 2006 | Reduce ventilation air | $23,954 | $17,587 |