ITAC Assessment: MA0616
ITAC logo
ITAC Assessment: MA0616
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Automotive timing chains
NAICS 333613: Mechanical Power Transmission Equipment Manufacturing
SIC 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 195
Plant Area 230,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $534,502 8,764,800
kWh
Electricity Demand $124,164 18,766
kW-mo/yr
Natural Gas $102,828 8,823
MMBtu
LPG $84,537 6,159
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $87,872 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,603

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $21,636 $132,834 $19,183
231,117
kWh
$2,453
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $6,128 $3,725 $5,438
64,742
kWh
$690
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $5,603 $2,550 $4,973
59,200
kWh
$630
-
kW-mo/yr
-
04 2.2437: Recover waste heat from equipment $37,450 $12,998 - - $37,450
-
MMBtu
05 2.7261: Install timers and/or thermostats $16,346 $1,088 $2,484
29,573
kWh
- $13,862
-
MMBtu
06 2.4323: Use optimum size and capacity equipment $709 $300 $629
7,488
kWh
$80
-
kW-mo/yr
-
TOTAL RECOMMENDED $87,872 $153,495 $32,707
392,120
kWh
$3,853
-
kW-mo/yr
$51,312
-
MMBtu
TOTAL IMPLEMENTED $5,603 $2,550 $4,973
59,200
kWh
$630
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs