ITAC Assessment: DL0107
ITAC logo
ITAC Assessment: DL0107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Pharmaceuticals
NAICS 311422: Specialty Canning
SIC 2834: Pharmaceutical Preparations
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 350,000
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,529,259 10,945,040
kWh
Natural Gas $331,524 28,329
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $314,431 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $136,640 $115,225 $136,640
976,000
kWh
-
02 2.2511: Insulate bare equipment $2,712 $1,626 $692
4,493
kWh
$2,020
-
MMBtu
03 2.7226: Use computer programs to optimize hvac performance $21,280 $100 $21,280
152,000
kWh
-
04 2.7226: Use computer programs to optimize hvac performance $16,000 $100 - $16,000
-
MMBtu
05 2.2437: Recover waste heat from equipment $17,100 $9,000 - $17,100
-
MMBtu
06 2.4224: Upgrade controls on compressors $85,260 $300 $85,260
609,000
kWh
-
07 2.2437: Recover waste heat from equipment $35,439 $106,317 - $35,439
-
MMBtu
TOTAL RECOMMENDED $314,431 $232,668 $243,872
1,741,493
kWh
$70,559
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs