ITAC Assessment: ME0295
ITAC logo
ITAC Assessment: ME0295
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Shoe Trees
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 100,000
ft2
Annual Production 1,680,000
pieces
Production Hrs. Annual 2,375
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $247,063 2,543,083
kWh
Electricity Demand $67,306 8,856
kW-mo/yr
LPG $10,075 1,426
MMBtu
Wood $7,488 8,640
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $91,503 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings Increase in Production Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,961 $72,500 $18,332
189,039
kWh
$6,629
-
kW-mo/yr
- - - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,533 $20,900 $10,533
108,734
kWh
- - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,918 $11,100 $3,858
39,859
kWh
$1,060
-
kW-mo/yr
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,043 $860 $4,043
41,618
kWh
- - - - -
05 2.4239: Eliminate or reduce compressed air usage $2,424 $210 $2,424
24,912
kWh
- - - - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,656 $1,330 $1,200
12,309
kWh
$456
-
kW-mo/yr
- - - -
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $815 $1,600 $359
3,810
kWh
$456
-
kW-mo/yr
- - - -
08 2.6212: Turn off equipment during breaks, reduce operating time $112 $130 $112
1,172
kWh
- - - - -
09 3.1182: Make a new by-product $15,041 $21,330 $(-21.0)
(-293)
kWh
- $(-5,760.0) $(-1,728.0) $22,550 -
10 4.122: Develop standard procedures to improve internal yields $27,000 $1,512 - - - - - $27,000
TOTAL RECOMMENDED $91,503 $131,472 $40,840
421,160
kWh
$8,601
-
kW-mo/yr
$(-5,760.0) $(-1,728.0) $22,550 $27,000
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs