Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Mechanical power transmission equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0265 #04 Y:2022 Eliminate combustible gas in flue gas $19,650 $2,435
IC0265 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $4,312 $7,533
IC0265 #02 Y:2022 Use insulation in furnaces to facilitate heating / cooling $705 $304
IC0265 #01 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $11,567 $5,100
BD0388 #05 Y:2011 Use distillation, evaporation to remove contaminants $63,847 $26,000
BD0388 #04 Y:2011 Install compressor air intakes in coolest locations $1,581 $1,200
BD0388 #03 Y:2011 Reduce combustion air flow to optimum $2,470 $4,000
BD0388 #02 Y:2011 Use radiant heater for spot heating $30,750 $20,000
BD0388 #01 Y:2011 Replace heat treating oven with more efficient unit $12,465 $60,000
BD0254 #14 Y:2003 Eliminate old stock and modify inventory control $3,800 $2,000
BD0254 #13 Y:2003 Contract a wood pallet recycling company $2,580 $240
BD0254 #12 Y:2003 Utilize higher efficiency lamps and/or ballasts $589 $1,023
BD0254 #11 Y:2003 Install occupancy sensors $681 $1,350
BD0254 #10 Y:2003 Reduce the pressure of compressed air to the minimum required $766 -
BD0254 #09 Y:2003 Utilize energy-efficient belts and other improved mechanisms $826 $1,514
BD0254 #08 Y:2003 Recover waste heat from equipment $1,134 $3,500
BD0254 #07 Y:2003 Install compressor air intakes in coolest locations $1,257 $1,000
BD0254 #06 Y:2003 Use synthetic lubricant $2,104 $700
BD0254 #05 Y:2003 Use most efficient type of electric motors $2,728 $2,885
BD0254 #04 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $3,675 $700