167
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Turbine and turbine generator set units manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UF0637 #11 Y:2025 | 11 | 2025 | Replace existing equipment with more suitable substitutes | $52,500 | $4,200 |
n/a
|
| UF0637 #10 Y:2025 | 10 | 2025 | Improve space comfort conditioning | $141,728 | $22,650 |
n/a
|
| UF0637 #09 Y:2025 | 09 | 2025 | Use sand for other purposes (eg construction fill, cover for municipal landfills) | $5,400 | $1,000 |
n/a
|
| UF0637 #08 Y:2025 | 08 | 2025 | Upgrade controls on compressors | $1,111 | $208 |
n/a
|
| UF0637 #07 Y:2025 | 07 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,448 | $469 |
n/a
|
| UF0637 #06 Y:2025 | 06 | 2025 | Use waste heat from hot flue gases to preheat | $9,314 | $12,000 |
n/a
|
| UF0637 #05 Y:2025 | 05 | 2025 | Utilize controls to operate equipment only when needed | $10,233 | $25,500 |
n/a
|
| UF0637 #04 Y:2025 | 04 | 2025 | Use or replace with energy efficient substitutes | $15,162 | $60,000 |
n/a
|
| UF0637 #03 Y:2025 | 03 | 2025 | Use most efficient type of electric motors | $24,548 | $21,000 |
n/a
|
| UF0637 #02 Y:2025 | 02 | 2025 | Use solar heat to make electricty | $50,327 | $322,608 |
n/a
|
| UF0637 #01 Y:2025 | 01 | 2025 | Use demand controller or load shedder | $134,351 | $114,981 |
n/a
|
| UF0631 #08 Y:2025 | 08 | 2025 | Replace existing equipment with more suitable substitutes | $45,000 | $1,900 |
n/a
|
| UF0631 #07 Y:2025 | 07 | 2025 | Improve space comfort conditioning | $65,876 | $2,873 |
n/a
|
| UF0631 #06 Y:2025 | 06 | 2025 | Upgrade controls on compressors | $1,095 | $4,000 |
n/a
|
| UF0631 #05 Y:2025 | 05 | 2025 | Reduce the pressure of compressed air to the minimum required | $1,201 | - |
n/a
|
| UF0631 #04 Y:2025 | 04 | 2025 | Minimize condenser cooling water temperature | $1,216 | $4,665 |
n/a
|
| UF0631 #03 Y:2025 | 03 | 2025 | Utilize controls to operate equipment only when needed | $2,030 | $500 |
n/a
|
| UF0631 #02 Y:2025 | 02 | 2025 | Use demand controller or load shedder | $30,505 | $15,454 |
n/a
|
| UF0631 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $45,516 | $322,608 |
n/a
|
| SD0668 #09 Y:2024 | 09 | 2024 | Optimize plant power factor | $134,656 | - |