ITAC Assessment: UF0645
ITAC logo
ITAC Assessment: UF0645
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Welding and Cutting Products
NAICS 333611: Turbine and Turbine Generator Set Units Manufacturing
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 72,000
ft2
Annual Production 10,000,000
units
Production Hrs. Annual 4,160
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,487 2,283,531
kWh
Electricity Demand $79,044 5,901
kW-mo/yr
Electricity Fees $12,663 -
TOTAL YEARLY COSTS $231,194
RECOMMENDED SAVINGS* $96,472 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.3191: Use demand controller or load shedder $15,284 $12,285 $9,751
159,847
kWh
$5,533
-
kW-mo/yr
-
02 2.6231: Utilize controls to operate equipment only when needed $10,771 $25,570 $10,771
176,572
kWh
- -
03 2.7132: Install timers on light switches in little used areas $4,803 $20,000 $4,803
78,744
kWh
- -
04 2.2623: Minimize condenser cooling water temperature $4,516 $6,528 $4,516
74,040
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,638 - $1,638
26,856
kWh
- -
06 2.2414: Use waste heat from hot flue gases to preheat $1,294 $1,610 $1,294
21,219
kWh
- -
07 2.7132: Install timers on light switches in little used areas $820 $315 $820
13,440
kWh
- -
08 4.652: Replace existing equipment with more suitable substitutes $28,500 $1,912 - - $28,500
09 4.424: Improve space comfort conditioning $28,846 $31,213 $(-12,650.0)
(-69,142)
kWh
- $41,496
TOTAL RECOMMENDED $96,472 $99,433 $20,943
481,576
kWh
$5,533
-
kW-mo/yr
$69,996
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs