ITAC Assessment: OR0147
ITAC logo
ITAC Assessment: OR0147
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PAPER PULP
NAICS
n/a
SIC 2611: Pulp Mills
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area
n/a
Annual Production 195,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,353,255 99,147,129
kWh
Natural Gas $2,206,910 1,037,505
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $176,166 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,347

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $10,344 - - $10,344
-
MMBtu
-
02 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $125,990 - $164,885
4,344,959
kWh
$(-36,895.0)
-
MMBtu
$(-2,000.0)
03 2.4133: Use most efficient type of electric motors $12,776 $19,623 $12,776
332,063
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,227 $6,838 $5,227
135,698
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,829 $150,050 $21,829
650,352
kWh
- -
TOTAL RECOMMENDED $176,166 $176,511 $204,717
5,463,072
kWh
$(-26,551.0)
-
MMBtu
$(-2,000.0)
TOTAL IMPLEMENTED $28,347 $26,461 $18,003
467,761
kWh
$10,344
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs