ITAC Assessment: UF0637
ITAC logo
ITAC Assessment: UF0637
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Turbine Components
NAICS 333611: Turbine and Turbine Generator Set Units Manufacturing
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area 155,000
ft2
Annual Production 120,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $976,766 21,371,598
kWh
Electricity Demand $936,278 45,347
kW-mo/yr
Electricity Fees $57,503 -
Natural Gas $384,241 41,889
MMBtu
Waste Disposal Costs
Water Usage $40,661 3,798
Tgal
TOTAL YEARLY COSTS $2,395,449
RECOMMENDED SAVINGS* $449,122 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.3191: Use demand controller or load shedder $134,351 $114,981 $68,817
1,496,012
kWh
$65,534
-
kW-mo/yr
- - -
02 2.9114: Use solar heat to make electricty $50,327 $322,608 $30,506
663,164
kWh
$19,821
-
kW-mo/yr
- - -
03 2.4133: Use most efficient type of electric motors $24,548 $21,000 $6,484
140,952
kWh
$18,064
-
kW-mo/yr
- - -
04 2.4322: Use or replace with energy efficient substitutes $15,162 $60,000 $(-13,000.0)
(-282,609)
kWh
$(-31,838.0)
-
kW-mo/yr
- - $60,000
05 2.6231: Utilize controls to operate equipment only when needed $10,233 $25,500 $10,233
222,452
kWh
- - - -
06 2.2414: Use waste heat from hot flue gases to preheat $9,314 $12,000 - - $9,314
-
MMBtu
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,448 $469 $4,448
96,682
kWh
- - - -
08 2.4224: Upgrade controls on compressors $1,111 $208 $1,111
24,148
kWh
- - - -
09 3.5222: Use sand for other purposes (eg construction fill, cover for municipal landfills) $5,400 $1,000 - - - - $5,400
10 4.424: Improve space comfort conditioning $141,728 $22,650 $(-1,261.0)
(-27,404)
kWh
$(-2,611.0)
-
kW-mo/yr
- $145,600 -
11 4.652: Replace existing equipment with more suitable substitutes $52,500 $4,200 - - - $52,500 -
TOTAL RECOMMENDED $449,122 $584,616 $107,338
2,333,397
kWh
$68,970
-
kW-mo/yr
$9,314
-
MMBtu
$198,100 $65,400
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs