matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OK1070 #08 Y:2022 | 08 | 2022 | Replace fossil fuel equipment with electrical equipment | $2,533 | $440 | |
| OK1070 #07 Y:2022 | 07 | 2022 | Utilize higher efficiency lamps and/or ballasts | $6,761 | $4,884 | |
| OK1070 #06 Y:2022 | 06 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $2,927 | $3,985 | |
| OK1070 #05 Y:2022 | 05 | 2022 | Upgrade controls on compressors | $2,659 | $8,954 | |
| OK1070 #04 Y:2022 | 04 | 2022 | Recover heat from exhausted steam, hot air or hot water | $3,689 | $3,294 | |
| OK1070 #03 Y:2022 | 03 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,014 | $990 | |
| OK1070 #02 Y:2022 | 02 | 2022 | Reduce the pressure of compressed air to the minimum required | $1,329 | - | |
| OK1070 #01 Y:2022 | 01 | 2022 | Optimize plant power factor | $2,809 | $9,600 | |
| OK1023 #06 Y:2019 | 06 | 2019 | Utilize higher efficiency lamps and/or ballasts | $9,874 | $15,402 | |
| OK1023 #05 Y:2019 | 05 | 2019 | Clean and maintain refrigerant condensers and towers | $415 | $538 | |
| OK1023 #04 Y:2019 | 04 | 2019 | Use radiant heater for spot heating | $915 | $3,252 | |
| OK1023 #03 Y:2019 | 03 | 2019 | Optimize plant power factor | $464 | $1,236 | |
| OK1023 #02 Y:2019 | 02 | 2019 | Use adjustable frequency drive or multiple speed motors on existing system | $1,606 | $4,736 | |
| OK1023 #01 Y:2019 | 01 | 2019 | Reduce the pressure of compressed air to the minimum required | $770 | - | |
| OK0816 #12 Y:2011 | 12 | 2011 | Insulate bare equipment | $1,893 | $2,263 | |
| OK0816 #11 Y:2011 | 11 | 2011 | Install compressor air intakes in coolest locations | $1,760 | $1,338 | |
| OK0816 #10 Y:2011 | 10 | 2011 | Eliminate leaks in inert gas and compressed air lines/ valves | $18,037 | - | |
| OK0816 #09 Y:2011 | 09 | 2011 | Use waste heat from hot flue gases to preheat | $4,244 | $11,700 | |
| OK0816 #08 Y:2011 | 08 | 2011 | Replace boiler | $26,135 | $24,220 | |
| OK0816 #07 Y:2011 | 07 | 2011 | Replace existing hvac unit with high efficiency model | $17,005 | $315,900 |