Assessment Year | 2020 |
---|---|
Principal Product | Re-manufactured Engines and Transmissions |
NAICS | 333618: Other Engine Equipment Manufacturing |
SIC | 3519: Internal Combustion Engines, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 95 |
Plant Area |
166,750
ft2
|
Annual Production | 960
units
|
Production Hrs. Annual | 3,432
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $46,686 | 908,840 |
kWh
|
$0.051 | |
Electricity Demand | $21,398 | 1,337 |
kW-mo/yr
|
$16.00 | |
Electricity Fees | $1,902 | - |
|
- | |
Natural Gas | $46,577 | 13,959 |
MMBtu
|
$3.34 | |
Waste Disposal Costs | |||||
Water Usage | $1,448 | 464 |
Tgal
|
$3.12 | |
TOTAL YEARLY COSTS | $118,011 | ||||
RECOMMENDED SAVINGS* | $14,044 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $770 | - |
$770
15,101
kWh
|
- | - | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,606 | $4,736 |
$1,606
31,485
kWh
|
- | - | - | |
03 | 2.3212: Optimize plant power factor | $464 | $1,236 | - | - | $464 | - | |
04 | 2.7231: Use radiant heater for spot heating | $915 | $3,252 | - | - | - |
$915
-
MMBtu
|
|
05 | 2.7211: Clean and maintain refrigerant condensers and towers | $415 | $538 |
$357
6,994
kWh
|
$58
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,874 | $15,402 |
$4,709
92,334
kWh
|
$5,165
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $14,044 | $25,164 |
$7,442
145,914
kWh
|
$5,223
-
kW-mo/yr
|
$464 |
$915
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs