| Assessment Year | 1990 |
|---|---|
| Principal Product | PIPECOATING |
| NAICS |
n/a
|
| SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 80 |
| Plant Area |
n/a
|
| Annual Production | 9,038
thousand feet
|
| Production Hrs. Annual | 2,400
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $269,266 | 3,456,917 |
kWh
|
$0.078 |
| Natural Gas | $29,923 | 8,238 |
MMBtu
|
$3.63 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $30,407 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $30,167 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $23,000 | $64,000 |
$23,000
-
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,100 | $2,000 |
$5,100
121,043
kWh
|
- | |
| 03 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,940 | $3,614 |
$1,940
40,739
kWh
|
- | |
| 04 | 2.2511: Insulate bare equipment | $240 | $180 | - |
$240
-
MMBtu
|
|
| 05 | 2.2511: Insulate bare equipment | $127 | $199 | - |
$127
-
MMBtu
|
|
| TOTAL RECOMMENDED | $30,407 | $69,993 |
$30,040
161,782
kWh
|
$367
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $30,167 | $69,813 |
$30,040
161,782
kWh
|
$127
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs