Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

626

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Engine, turbine, and power transmission equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CI0080 #08 Y:2026 Replace fossil fuel equipment with electrical equipment $2,020 $7,000
CI0080 #07 Y:2026 Optimize plant power factor $2,237 $6,500
CI0080 #06 Y:2026 Convert to high volume low pressure (hvlp) paint guns $3,360 $7,500
CI0080 #05 Y:2026 Install or upgrade insulation on hvac distribution systems $5,763 $30,000
CI0080 #04 Y:2026 Reduce the pressure of compressed air to the minimum required $12,133 $7,225
CI0080 #03 Y:2026 Adjust / maintain fork lift trucks for most efficient operation $39,972 $78,000
CI0080 #02 Y:2026 Size air handling grills/ duct/s coils to minimize air resistance $50,000 $365,000
CI0080 #01 Y:2026 Replace existing equipment with more suitable substitutes $230,000 $1,000,000
UF0645 #09 Y:2026 Improve space comfort conditioning $39,813 $31,213
UF0645 #08 Y:2026 Replace existing equipment with more suitable substitutes $28,500 $1,912
UF0645 #07 Y:2026 Install timers on light switches in little used areas $820 $315
UF0645 #06 Y:2026 Use waste heat from hot flue gases to preheat $1,294 $1,610
UF0645 #05 Y:2026 Reduce the pressure of compressed air to the minimum required $1,638 -
UF0645 #04 Y:2026 Minimize condenser cooling water temperature $4,516 $6,528
UF0645 #03 Y:2026 Install timers on light switches in little used areas $4,803 $20,000
UF0645 #02 Y:2026 Utilize controls to operate equipment only when needed $10,771 $25,570
UF0645 #01 Y:2026 Use demand controller or load shedder $15,284 $12,285
MS0467 #04 Y:2026 Optimize plant power factor $18,243 $121,000
MS0467 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $10,936 -
MS0467 #02 Y:2026 Install vinyl strip / high speed / air curtain doors $5,879 $1,680