ITAC Assessment: MU0079
ITAC logo
ITAC Assessment: MU0079
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Gear Boxes
NAICS 333612: Speed Changer, Industrial High-Speed Drive, and Gear Manufacturing
SIC 3566: Speed Changers, Industrial High-Speed Drives, and Gears
Sales Range $50
M
to 100
M
# of Employees 181
Plant Area 270,000
ft2
Annual Production 2,100
units
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $528,609 5,755,436
kWh
Electricity Demand $1 18,085
kW-mo/yr
Electricity Fees $8,014 -
Natural Gas $202,933 43,004
MMBtu
Other Gas $23,188 1
MMBtu
TOTAL YEARLY COSTS $762,745
RECOMMENDED SAVINGS* $46,301 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.7232: Replace existing hvac unit with high efficiency model $33,104 $284,789 $13,327
144,860
kWh
$15,000 $4,777
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,989 $320 $4,989
54,231
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $1,020 $3,218 $1,020
11,090
kWh
- -
04 2.6231: Utilize controls to operate equipment only when needed $3,238 $3,797 - - $3,238
-
MMBtu
05 2.7134: Use photocell controls $121 $286 $121
131
kWh
- -
06 2.7135: Install occupancy sensors $2,030 $3,314 $2,030
22,061
kWh
- -
07 4.821: Pay bills on time to avoid late fees $1,800 - - $1,420 $380
-
MMBtu
TOTAL RECOMMENDED $46,301 $295,724 $21,487
232,372
kWh
$16,420 $8,395
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs