Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

578

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Engine, turbine, and power transmission equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2201 #07 Y:2022 Use solar heat to make electricty $158,531 $626,592
UC2201 #06 Y:2022 Reduce the pressure of compressed air to the minimum required $1,185 $200
UC2201 #05 Y:2022 Install compressor air intakes in coolest locations $2,009 $4,000
UC2201 #04 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $5,728 $2,000
UC2201 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $20,036 $48,285
UC2201 #02 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $3,440 $15,982
UC2201 #01 Y:2022 Replace existing hvac unit with high efficiency model $13,041 $56,085
AM0851 #08 Y:2022 Use photocell controls $120 $261
AM0851 #07 Y:2022 Reduce the pressure of compressed air to the minimum required $580 $40
AM0851 #06 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $348 $750
AM0851 #05 Y:2022 Eliminate or reduce compressed air usage $650 $1,795
AM0851 #04 Y:2022 Use synthetic lubricant $185 $300
AM0851 #03 Y:2022 Utilize energy-efficient belts and other improved mechanisms $277 $972
AM0851 #02 Y:2022 Optimize plant power factor $7,294 $18,267
AM0851 #01 Y:2022 Apply for tax-free status for energy purchases $42,809 $2,862
TT0279 #05 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $2,432 $4,000
TT0279 #04 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $5,957 $250
TT0279 #03 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $6,514 $12,000
TT0279 #02 Y:2022 Use solar heat to make electricty $12,173 $63,875
TT0279 #01 Y:2022 Eliminate or reduce compressed air usage $43,670 $43,750