Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

578

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Engine, turbine, and power transmission equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0001 #02 Y:2006 Clean condenser tubes $1 $26,405
TT0001 #01 Y:2006 Moderate cooling tower outlet temperature $2,856 $3,500
UD0757 #09 Y:2006 Use separate switches on perimeter lighting which may be turned off when natural light is available $1,300 $992
UD0757 #08 Y:2006 Utilize energy-efficient belts and other improved mechanisms $4,293 -
UD0757 #07 Y:2006 Reduce ventilation air $5,019 -
UD0757 #06 Y:2006 Use optimum thickness insulation $5,633 $606
UD0757 #05 Y:2006 Analyze flue gas for proper air/fuel ratio $8,031 -
UD0757 #04 Y:2006 Use optimum temperature $8,681 -
UD0757 #03 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $10,547 $1,600
UD0757 #02 Y:2006 Utilize higher efficiency lamps and/or ballasts $24,618 $48,190
UD0757 #01 Y:2006 Analyze flue gas for proper air/fuel ratio $32,124 -
MA0611 #09 Y:2006 Install vinyl strip / high speed / air curtain doors $504 $3,600
MA0611 #08 Y:2006 Utilize higher efficiency lamps and/or ballasts $888 $6,305
MA0611 #07 Y:2006 Insulate bare equipment $3,330 $3,300
MA0611 #06 Y:2006 Repair furnaces and oven doors so that they seal efficiently $3,833 $5,368
MA0611 #05 Y:2006 Use optimum temperature $6,194 $12,675
MA0611 #04 Y:2006 Replace electrically-operated equipment with fossil fuel equipment $7,443 $17,876
MA0611 #03 Y:2006 Reduce ventilation air $23,954 $17,587
MA0611 #02 Y:2006 Utilize higher efficiency lamps and/or ballasts $33,486 $186,840
MA0611 #01 Y:2006 Use waste heat from hot flue gases to preheat $98,826 $74,772