Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

557

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Engine, turbine, and power transmission equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0668 #09 Y:2024 Optimize plant power factor $134,656 -
SD0668 #08 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,230 $3,246
SD0668 #07 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $300 $1,214
SD0668 #06 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $922 $1,623
SD0668 #05 Y:2024 Install direct acting units in place of compressed air pressure system in safety system $3,614 $4,200
SD0668 #04 Y:2024 Eliminate or reduce compressed air usage $3,208 $2,050
SD0668 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $1,775 -
SD0668 #02 Y:2024 Use battery storage for demand control $66,206 $29,341
SD0668 #01 Y:2024 Use solar heat to make electricty $254,982 $555,003
MZ0361 #09 Y:2024 Use solar heat to make electricty $322,316 $3,602,500
MZ0361 #08 Y:2024 Minimize water usage $71,580 $385,388
MZ0361 #07 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $41,882 $33,744
MZ0361 #06 Y:2024 Re-size charging openings or add a movable door on equipment $45,827 $6,720
MZ0361 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $20,374 $117,036
MZ0361 #04 Y:2024 Install occupancy sensors $2,158 $1,750
MZ0361 #03 Y:2024 Analyze flue gas for proper air/fuel ratio $13,797 $4,800
MZ0361 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $5,784 $1,000
MZ0361 #01 Y:2024 Eliminate or reduce compressed air usage $1,633 $6,555
WV0660 #09 Y:2024 Reduce the pressure of compressed air to the minimum required $383 $104
WV0660 #08 Y:2024 Eliminate or reduce compressed air usage $1,979 $4,576