Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

856

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Metalworking machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CW0112 #08 Y:2020 Reschedule and rearrange multiple-source heating systems $7,871 $14,588
CW0112 #07 Y:2020 Replace existing hvac unit with high efficiency model $3,966 $800
CW0112 #06 Y:2020 Treat and reuse rinse waters $15,861 $10,000
CW0112 #05 Y:2020 Install vinyl strip / high speed / air curtain doors $2,268 $3,429
CW0112 #04 Y:2020 Replace hydraulic / pneumatic equipment with electric equipment $1,678 $800
CW0112 #03 Y:2020 Use / purchase optimum sized compressor $2,643 $848
CW0112 #02 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $1,658 $100
CW0112 #01 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $5,912 $330
NL0042 #08 Y:2019 Install occupancy sensors $214 $1,050
NL0042 #07 Y:2019 Combine utility meters $565 $1,250
NL0042 #06 Y:2019 Use demand controller or load shedder $2,989 $2,400
NL0042 #05 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $3,445 $1,600
NL0042 #04 Y:2019 Optimize plant power factor $3,805 $19,000
NL0042 #03 Y:2019 Change rate schedules or other changes in utility service $10,000 $800
NL0042 #02 Y:2019 Utilize higher efficiency lamps and/or ballasts $10,309 $10,400
NL0042 #01 Y:2019 Utilize higher efficiency lamps and/or ballasts $18,799 $15,889
NC0644 #06 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $12,387 $50,000
NC0644 #05 Y:2019 Reschedule plant operations or reduce load to avoid peaks $5,800 -
NC0644 #04 Y:2019 Turn off equipment during breaks, reduce operating time $1,639 -
NC0644 #03 Y:2019 Utilize higher efficiency lamps and/or ballasts $10,841 $25,826