ITAC Assessment: NC0644
ITAC logo
ITAC Assessment: NC0644
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Tools and display packs plus large distribution center
NAICS 333517: Machine Tool Manufacturing
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $100
M
to 500
M
# of Employees 470
Plant Area 500,000
ft2
Annual Production 1,300,000
pieces
Production Hrs. Annual 5,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $490,768 9,760,000
kWh
Electricity Demand $217,313 16,768
kW-mo/yr
Natural Gas $47,281 6,519
MMBtu
TOTAL YEARLY COSTS $755,362
RECOMMENDED SAVINGS* $82,767 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,941

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4131: Size electric motors for peak operating efficiency $28,909 $65,575 $21,366
424,772
kWh
$7,543
-
kW-mo/yr
02 2.7232: Replace existing hvac unit with high efficiency model $23,191 $30,000 $11,661
231,831
kWh
$11,530
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,841 $25,826 $6,894
137,051
kWh
$3,947
-
kW-mo/yr
04 2.6212: Turn off equipment during breaks, reduce operating time $1,639 - $1,639
32,585
kWh
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,800 - - $5,800
-
kW-mo/yr
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,387 $50,000 $7,877
156,600
kWh
$4,510
-
kW-mo/yr
TOTAL RECOMMENDED $82,767 $171,401 $49,437
982,839
kWh
$33,330
-
kW-mo/yr
TOTAL IMPLEMENTED $62,941 $121,401 $39,921
793,654
kWh
$23,020
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs