ITAC Assessment: IA0014
ITAC logo
ITAC Assessment: IA0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product SPICES
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 325
Plant Area
n/a
Annual Production 25,000,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,063 4,438,160
kWh
Natural Gas $38,795 10,220
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,653 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,760 $1,000 $2,760
60,668
kWh
- -
02 2.6231: Utilize controls to operate equipment only when needed $787 $100 $787
17,292
kWh
- -
03 2.4133: Use most efficient type of electric motors $403 $1,768 $403
8,792
kWh
- -
04 2.7243: Improve air circulation with destratification fans / other methods $5,788 $6,475 $(-472.0)
(-10,258)
kWh
$6,260
-
MMBtu
-
05 2.7261: Install timers and/or thermostats $1,361 $600 - $1,361
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $554 - $793
17,292
kWh
- $(-239.0)
TOTAL RECOMMENDED $11,653 $9,943 $4,271
93,786
kWh
$7,621
-
MMBtu
$(-239.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs