853
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0337 #08 Y:2005 | 08 | 2005 | Reduce the pressure of compressed air to the minimum required | $1,981 | $80 | |
| WV0337 #07 Y:2005 | 07 | 2005 | Install compressor air intakes in coolest locations | $2,082 | $590 | |
| WV0337 #06 Y:2005 | 06 | 2005 | Develop a repair/replace policy | $2,233 | $760 | |
| WV0337 #05 Y:2005 | 05 | 2005 | Minimize use of outside make-up air for ventilation except when used for economizer cycle | $3,170 | $2,350 | |
| WV0337 #04 Y:2005 | 04 | 2005 | Utilize higher efficiency lamps and/or ballasts | $4,690 | - | |
| WV0337 #03 Y:2005 | 03 | 2005 | Insulate bare equipment | $5,170 | $2,156 | |
| WV0337 #02 Y:2005 | 02 | 2005 | Turn off equipment when not in use | $5,455 | $800 | |
| WV0337 #01 Y:2005 | 01 | 2005 | Use adjustable frequency drive or multiple speed motors on existing system | $64,554 | $123,600 | |
| UD0738 #12 Y:2005 | 12 | 2005 | Recover waste heat from equipment | $89 | $400 | |
| UD0738 #11 Y:2005 | 11 | 2005 | Keep doors and windows shut when not on use | $382 | $459 | |
| UD0738 #10 Y:2005 | 10 | 2005 | Reduce the pressure of compressed air to the minimum required | $401 | - | |
| UD0738 #09 Y:2005 | 09 | 2005 | Substitute compressed air cooling with water or air cooling | $658 | $500 | |
| UD0738 #08 Y:2005 | 08 | 2005 | Upgrade controls on compressors | $859 | - | |
| UD0738 #07 Y:2005 | 07 | 2005 | Recover waste heat from equipment | $1,348 | $500 | |
| UD0738 #06 Y:2005 | 06 | 2005 | Use adjustable frequency drive or multiple speed motors on existing system | $1,479 | $1,700 | |
| UD0738 #05 Y:2005 | 05 | 2005 | Use computer programs to optimize hvac performance | $1,819 | - | |
| UD0738 #04 Y:2005 | 04 | 2005 | Use computer programs to optimize hvac performance | $7,084 | - | |
| UD0738 #03 Y:2005 | 03 | 2005 | Use properly designed and sized hvac equipment | $8,313 | - | |
| UD0738 #02 Y:2005 | 02 | 2005 | Recover and reuse waste material | $28,944 | $2,000 | |
| UD0738 #01 Y:2005 | 01 | 2005 | Add equipment/ operators to reduce production bottleneck | $91,800 | $6,000 |