ITAC Assessment: SU0259
ITAC logo
ITAC Assessment: SU0259
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Wire and Tubing Processing Machines
NAICS 333519: Rolling Mill and Other Metalworking Machinery Manufacturing
SIC 3549: Metalworking Machinery, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 46
Plant Area 26,856
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 2,040
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,247 331,533
kWh
Electricity Demand $15,532 1,616
kW-mo/yr
Electricity Fees $4,819 -
Natural Gas $10,285 756
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,788 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,537

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,279 - $856
7,446
kWh
$423
-
kW-mo/yr
- -
02 2.8114: Change rate schedules or other changes in utility service $1,332 - - - - $1,332
03 2.8114: Change rate schedules or other changes in utility service $411 - - - - $411
04 2.7229: Air condition only space necessary $763 $13 $600
5,214
kWh
$163
-
kW-mo/yr
- -
05 2.6218: Turn off equipment when not in use $290 $38 $175
1,520
kWh
$115
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $221 $50 $148
1,285
kWh
$73
-
kW-mo/yr
- -
07 2.4221: Install compressor air intakes in coolest locations $410 $232 $275
2,387
kWh
$135
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $272 $231 $161
1,402
kWh
$19
-
kW-mo/yr
$92 -
09 2.6211: Conserve energy by efficient use of vending machines $508 $546 $508
4,418
kWh
- - -
10 2.7135: Install occupancy sensors $302 $973 $302
2,627
kWh
- - -
TOTAL RECOMMENDED $5,788 $2,083 $3,025
26,299
kWh
$928
-
kW-mo/yr
$92 $1,743
TOTAL IMPLEMENTED $3,537 $1,537 $2,517
21,881
kWh
$928
-
kW-mo/yr
$92 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs