Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Metalworking machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0378 #06 Y:2025 Use solar heat to make electricty $196,374 $1,560,000
MZ0378 #05 Y:2025 Recover waste heat from equipment $10,844 $12,060
MZ0378 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,470 $750
MZ0378 #03 Y:2025 Install occupancy sensors $4,373 $750
MZ0378 #02 Y:2025 Reduce illumination to minimum necessary levels $26,585 $49,000
MZ0378 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,972 $3,500
MZ0202 #08 Y:2015 Use most efficient type of electric motors $6,722 $7,341
MZ0202 #07 Y:2015 Condense operation into one building $7,503 -
MZ0202 #06 Y:2015 Condense operation into one building $3,585 -
MZ0202 #05 Y:2015 Upgrade controls on compressors $9,678 $45,000
MZ0202 #04 Y:2015 Recover waste heat from equipment $3,839 $3,225
MZ0202 #03 Y:2015 Install compressor air intakes in coolest locations $6,654 $5,000
MZ0202 #02 Y:2015 Utilize higher efficiency lamps and/or ballasts $17,180 $27,600
MZ0202 #01 Y:2015 Replace existing hvac unit with high efficiency model $19,101 $70,000
MZ0142 #06 Y:2014 Use photocell controls $1,432 $980
MZ0142 #05 Y:2014 Utilize higher efficiency lamps and/or ballasts $10,435 $31,000
MZ0142 #04 Y:2014 Insulate bare equipment $206 $720
MZ0142 #03 Y:2014 Install compressor air intakes in coolest locations $2,716 $2,500
MZ0142 #02 Y:2014 Recover waste heat from equipment $505 $1,000
MZ0142 #01 Y:2014 Install smaller boiler (increase high fire duty cycle) $5,862 $6,500