Assessment Year | 2016 |
---|---|
Principal Product | Machine tools |
NAICS | 333517: Machine Tool Manufacturing |
SIC | 3541: Machine Tools, Metal Cutting Types |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
208,000
ft2
|
Annual Production | 1,000
units
|
Production Hrs. Annual | 5,800
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $248,851 | 3,940,000 |
kWh
|
$0.063 |
Electricity Demand | $90,222 | 11,639 |
kW-mo/yr
|
$7.75 |
Natural Gas | $43,812 | 9,963 |
MMBtu
|
$4.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $74,262 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7232: Replace existing hvac unit with high efficiency model | $19,101 | $70,000 |
$14,869
235,416
kWh
|
$4,232
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,180 | $27,600 |
$13,699
216,891
kWh
|
$3,481
-
kW-mo/yr
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $6,654 | $5,000 |
$5,305
84,000
kWh
|
$1,349
-
kW-mo/yr
|
- | |
04 | 2.2437: Recover waste heat from equipment | $3,839 | $3,225 | - | - |
$3,839
-
MMBtu
|
|
05 | 2.4224: Upgrade controls on compressors | $9,678 | $45,000 |
$9,678
153,228
kWh
|
- | - | |
06 | 4.512: Condense operation into one building | $3,585 | - |
$3,585
56,768
kWh
|
- | - | |
07 | 4.512: Condense operation into one building | $7,503 | - |
$3,950
62,540
kWh
|
$1,209
-
kW-mo/yr
|
$2,344
-
MMBtu
|
|
08 | 2.4133: Use most efficient type of electric motors | $6,722 | $7,341 |
$5,156
81,630
kWh
|
$1,566
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $74,262 | $158,166 |
$56,242
890,473
kWh
|
$11,837
-
kW-mo/yr
|
$6,183
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs