Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,067

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Ventilation, heating, air-conditioning, and commercial refrigeration equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0382 #05 Y:2011 Install compressor air intakes in coolest locations $2,936 $1,056
MS0382 #04 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $5,932 $480
MS0382 #03 Y:2011 Make a practice of turning off lights when not needed $14,805 -
MS0382 #02 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $15,473 $142
MS0382 #01 Y:2011 Utilize higher efficiency lamps and/or ballasts $76,988 $223,560
NC0434 #09 Y:2011 Replace electric motor with fossil fuel engine $1,039 $876
NC0434 #08 Y:2011 Utilize higher efficiency lamps and/or ballasts $3,087 $10,660
NC0434 #07 Y:2011 Utilize higher efficiency lamps and/or ballasts $19,609 $32,453
NC0434 #06 Y:2011 Cover open tanks $414 $908
NC0434 #05 Y:2011 Replace boiler $5,957 $26,400
NC0434 #04 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $142 $100
NC0434 #03 Y:2011 Reduce the pressure of compressed air to the minimum required $1,424 $1,000
NC0434 #02 Y:2011 Eliminate or reduce compressed air usage $3,152 $14,895
NC0434 #01 Y:2011 Recover waste heat from equipment $3,138 $2,127
NC0433 #08 Y:2011 Make a practice of turning off lights when not needed $276 -
NC0433 #07 Y:2011 Develop a repair/replace policy $2,159 $3,999
NC0433 #06 Y:2011 Clean or color roof to reduce solar load $17,685 $29,025
NC0433 #05 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $2,334 $100
NC0433 #04 Y:2011 Reduce the pressure of compressed air to the minimum required $7,299 $50
NC0433 #03 Y:2011 Recover waste heat from equipment $7,463 $10,818