ITAC Assessment: NC0434
ITAC logo
ITAC Assessment: NC0434
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Indoor air quality equipment
NAICS 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 265,000
ft2
Annual Production 25,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,076 3,198,000
kWh
Electricity Demand $83,312 9,800
kW-mo/yr
Natural Gas $111,682 15,085
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,962 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,005

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2437: Recover waste heat from equipment $3,138 $2,127 - - $3,138
-
MMBtu
- -
02 2.4239: Eliminate or reduce compressed air usage $3,152 $14,895 $1,938
36,443
kWh
$1,214
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,424 $1,000 $897
16,866
kWh
$527
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $142 $100 $357
6,705
kWh
$205
-
kW-mo/yr
- $(-300.0) $(-120.0)
05 2.1224: Replace boiler $5,957 $26,400 - - $5,957
-
MMBtu
- -
06 2.2514: Cover open tanks $414 $908 - - $414
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $19,609 $32,453 $11,096
208,658
kWh
$8,513
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,087 $10,660 $1,804
33,915
kWh
$1,383
-
kW-mo/yr
- - $(-100.0)
09 2.4134: Replace electric motor with fossil fuel engine $1,039 $876 $410
7,710
kWh
$629
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $37,962 $89,419 $16,502
310,297
kWh
$12,471
-
kW-mo/yr
$9,509
-
MMBtu
$(-300.0) $(-220.0)
TOTAL IMPLEMENTED $32,005 $63,019 $16,502
310,297
kWh
$12,471
-
kW-mo/yr
$3,552
-
MMBtu
$(-300.0) $(-220.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs