1,067
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SU0328 #02 Y:2012 | 02 | 2012 | Reschedule plant operations or reduce load to avoid peaks | $5,399 | $1,890 | |
| SU0328 #01 Y:2012 | 01 | 2012 | Utilize energy-efficient belts and other improved mechanisms | $164 | - | |
| BS0011 #06 Y:2012 | 06 | 2012 | Install occupancy sensors | $250 | $600 | |
| BS0011 #05 Y:2012 | 05 | 2012 | Re-size charging openings or add a movable door on equipment | $8,243 | $900 | |
| BS0011 #04 Y:2012 | 04 | 2012 | Use waste heat from hot flue gases to preheat | $4,878 | $6,670 | |
| BS0011 #03 Y:2012 | 03 | 2012 | Improve air circulation with destratification fans / other methods | $15,728 | $29,500 | |
| BS0011 #02 Y:2012 | 02 | 2012 | Reduce ventilation air | $4,008 | $6,725 | |
| BS0011 #01 Y:2012 | 01 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,102 | $973 | |
| WV0452 #16 Y:2012 | 16 | 2012 | Remove or close off unneeded compressed air lines | $277 | $85 | |
| WV0452 #15 Y:2012 | 15 | 2012 | Install compressor air intakes in coolest locations | $431 | $1,505 | |
| WV0452 #14 Y:2012 | 14 | 2012 | Use adjustable frequency drive or multiple speed motors on existing system | $873 | $4,350 | |
| WV0452 #13 Y:2012 | 13 | 2012 | Reduce the pressure of compressed air to the minimum required | $1,098 | $1,105 | |
| WV0452 #12 Y:2012 | 12 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,146 | $618 | |
| WV0452 #11 Y:2012 | 11 | 2012 | Install / repair insulation on steam lines | $3,487 | $10,561 | |
| WV0452 #10 Y:2012 | 10 | 2012 | Eliminate or reduce compressed air usage | $3,515 | $2,117 | |
| WV0452 #09 Y:2012 | 09 | 2012 | Utilize energy-efficient belts and other improved mechanisms | $4,587 | $1,000 | |
| WV0452 #08 Y:2012 | 08 | 2012 | Develop a repair/replace policy | $6,936 | $1,656 | |
| WV0452 #07 Y:2012 | 07 | 2012 | Analyze flue gas for proper air/fuel ratio | $9,507 | $2,500 | |
| WV0452 #06 Y:2012 | 06 | 2012 | Use waste heat from hot flue gases to preheat | $9,772 | $54,225 | |
| WV0452 #05 Y:2012 | 05 | 2012 | Establish a preventative maintenance program | $14,172 | $1,000 |