| Assessment Year | 2012 |
|---|---|
| Principal Product | Gas Fireplaces |
| NAICS | 333414: Heating Equipment (except Warm Air Furnaces) Manufacturing |
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $50 M to 100M |
| # of Employees | 220 |
| Plant Area |
120,000
ft2
|
| Annual Production | 21,000
pieces
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $179,534 | 2,376,480 |
kWh
|
$0.076 |
| Electricity Demand | $47,557 | 8,421 |
kW-mo/yr
|
$5.65 |
| Natural Gas | $138,229 | 18,845 |
MMBtu
|
$7.34 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $34,209 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,360 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,102 | $973 |
$1,102
14,698
kWh
|
- | - | |
| 02 | 2.7314: Reduce ventilation air | $4,008 | $6,725 |
$2,916
38,882
kWh
|
$1,092
-
kW-mo/yr
|
- | |
| 03 | 2.7243: Improve air circulation with destratification fans / other methods | $15,728 | $29,500 | - | - |
$15,728
-
MMBtu
|
|
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $4,878 | $6,670 | - | - |
$4,878
-
MMBtu
|
|
| 05 | 2.1122: Re-size charging openings or add a movable door on equipment | $8,243 | $900 | - | - |
$8,243
-
MMBtu
|
|
| 06 | 2.7135: Install occupancy sensors | $250 | $600 |
$250
3,341
kWh
|
- | - | |
| TOTAL RECOMMENDED | $34,209 | $45,368 |
$4,268
56,921
kWh
|
$1,092
-
kW-mo/yr
|
$28,849
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $5,360 | $8,298 |
$4,268
56,921
kWh
|
$1,092
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs