Assessment Year | 2012 |
---|---|
Principal Product | Gas Fireplaces |
NAICS | 333414: Heating Equipment (except Warm Air Furnaces) Manufacturing |
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $50 M to 100M |
# of Employees | 220 |
Plant Area |
120,000
ft2
|
Annual Production | 21,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $179,534 | 2,376,480 |
kWh
|
$0.076 |
Electricity Demand | $47,557 | 8,421 |
kW-mo/yr
|
$5.65 |
Natural Gas | $138,229 | 18,845 |
MMBtu
|
$7.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,209 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,360 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,102 | $973 |
$1,102
14,698
kWh
|
- | - | |
02 | 2.7314: Reduce ventilation air | $4,008 | $6,725 |
$2,916
38,882
kWh
|
$1,092
-
kW-mo/yr
|
- | |
03 | 2.7243: Improve air circulation with destratification fans / other methods | $15,728 | $29,500 | - | - |
$15,728
-
MMBtu
|
|
04 | 2.2414: Use waste heat from hot flue gases to preheat | $4,878 | $6,670 | - | - |
$4,878
-
MMBtu
|
|
05 | 2.1122: Re-size charging openings or add a movable door on equipment | $8,243 | $900 | - | - |
$8,243
-
MMBtu
|
|
06 | 2.7135: Install occupancy sensors | $250 | $600 |
$250
3,341
kWh
|
- | - | |
TOTAL RECOMMENDED | $34,209 | $45,368 |
$4,268
56,921
kWh
|
$1,092
-
kW-mo/yr
|
$28,849
-
MMBtu
|
||
TOTAL IMPLEMENTED | $5,360 | $8,298 |
$4,268
56,921
kWh
|
$1,092
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs