ITAC Assessment: BS0011
ITAC logo
ITAC Assessment: BS0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Gas Fireplaces
NAICS 333414: Heating Equipment (except Warm Air Furnaces) Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $50
M
to 100
M
# of Employees 220
Plant Area 120,000
ft2
Annual Production 21,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,534 2,376,480
kWh
Electricity Demand $47,557 8,421
kW-mo/yr
Natural Gas $138,229 18,845
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,209 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,360

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,102 $973 $1,102
14,698
kWh
- -
02 2.7314: Reduce ventilation air $4,008 $6,725 $2,916
38,882
kWh
$1,092
-
kW-mo/yr
-
03 2.7243: Improve air circulation with destratification fans / other methods $15,728 $29,500 - - $15,728
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $4,878 $6,670 - - $4,878
-
MMBtu
05 2.1122: Re-size charging openings or add a movable door on equipment $8,243 $900 - - $8,243
-
MMBtu
06 2.7135: Install occupancy sensors $250 $600 $250
3,341
kWh
- -
TOTAL RECOMMENDED $34,209 $45,368 $4,268
56,921
kWh
$1,092
-
kW-mo/yr
$28,849
-
MMBtu
TOTAL IMPLEMENTED $5,360 $8,298 $4,268
56,921
kWh
$1,092
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings