1,045
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OK0878 #03 Y:2014 | 03 | 2014 | Install compressor air intakes in coolest locations | $1,296 | $1,222 | |
| OK0878 #02 Y:2014 | 02 | 2014 | Use or replace with energy efficient substitutes | $3,459 | $5,148 | |
| OK0878 #01 Y:2014 | 01 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,554 | $1,400 | |
| TT0124 #06 Y:2013 | 06 | 2013 | Utilize higher efficiency lamps and/or ballasts | $618 | $2,285 | |
| TT0124 #05 Y:2013 | 05 | 2013 | Utilize higher efficiency lamps and/or ballasts | $326 | $50 | |
| TT0124 #04 Y:2013 | 04 | 2013 | Utilize higher efficiency lamps and/or ballasts | $2,486 | $9,660 | |
| TT0124 #03 Y:2013 | 03 | 2013 | Reduce the pressure of compressed air to the minimum required | $10,755 | $100 | |
| TT0124 #02 Y:2013 | 02 | 2013 | Use / purchase optimum sized compressor | $103,306 | $10,000 | |
| TT0124 #01 Y:2013 | 01 | 2013 | Size electric motors for peak operating efficiency | $16,604 | $5,500 | |
| NC0497 #09 Y:2013 | 09 | 2013 | Avoid introducing hot, humid, or dirty air into hvac system | $360 | $650 | |
| NC0497 #08 Y:2013 | 08 | 2013 | Develop a repair/replace policy | $3,513 | $4,256 | |
| NC0497 #07 Y:2013 | 07 | 2013 | Reduce illumination to minimum necessary levels | $2,053 | $513 | |
| NC0497 #06 Y:2013 | 06 | 2013 | Use photocell controls | $2,032 | $120 | |
| NC0497 #05 Y:2013 | 05 | 2013 | Install occupancy sensors | $13,386 | $2,785 | |
| NC0497 #04 Y:2013 | 04 | 2013 | Utilize higher efficiency lamps and/or ballasts | $4,827 | $11,647 | |
| NC0497 #03 Y:2013 | 03 | 2013 | Recover waste heat from equipment | $1,793 | $2,250 | |
| NC0497 #02 Y:2013 | 02 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,761 | $100 | |
| NC0497 #01 Y:2013 | 01 | 2013 | Replace electrically-operated equipment with fossil fuel equipment | $15,740 | $70,400 | |
| OK0862 #07 Y:2013 | 07 | 2013 | Use optimum size and capacity equipment | $7,599 | $12,000 | |
| OK0862 #06 Y:2013 | 06 | 2013 | Use optimum size and capacity equipment | $2,177 | $8,000 |