ITAC Assessment: TT0130
ITAC logo
ITAC Assessment: TT0130
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product RV Appliance and HVAC units
NAICS 333414: Heating Equipment (except Warm Air Furnaces) Manufacturing
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 300,000
ft2
Annual Production 700,000
pieces
Production Hrs. Annual 4,375
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $221,540 3,486,464
kWh
Electricity Demand $164,920 14,113
kW-mo/yr
Electricity Fees $13,515 -
Natural Gas $224,569 42,940
MMBtu
LPG $30,427 1,766
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,771 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,724

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3212: Optimize plant power factor $29,307 $44,000 - $29,307
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,560 $12,150 $4,406
68,850
kWh
$2,154
-
kW-mo/yr
03 2.4239: Eliminate or reduce compressed air usage $4,677 $4,500 $3,145
49,140
kWh
$1,532
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,047 $3,000 $1,377
21,513
kWh
$670
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,989 $20,000 $4,700
73,440
kWh
$2,289
-
kW-mo/yr
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,191 $6,041 $2,146
33,525
kWh
$1,045
-
kW-mo/yr
TOTAL RECOMMENDED $52,771 $89,691 $15,774
246,468
kWh
$36,997
-
kW-mo/yr
TOTAL IMPLEMENTED $50,724 $86,691 $14,397
224,955
kWh
$36,327
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs