ITAC Assessment: OK0878
ITAC logo
ITAC Assessment: OK0878
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Fans, Blowers and Ventilation Equipments
NAICS 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 264
Plant Area 350,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 4,524
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,884 3,650,400
kWh
Electricity Demand $61,596 10,620
kW-mo/yr
Natural Gas $90,657 18,571
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,018 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,137

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,554 $1,400 $8,554
174,564
kWh
- - -
02 2.4322: Use or replace with energy efficient substitutes $3,459 $5,148 $3,459
70,599
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $1,296 $1,222 $1,296
26,449
kWh
- - -
04 2.6231: Utilize controls to operate equipment only when needed $3,905 $262 $3,905
79,697
kWh
- - -
05 2.6127: Maintain air filters by cleaning or replacement $229 $525 $229
4,671
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,064 $3,192 $1,064
21,709
kWh
- - -
07 2.7211: Clean and maintain refrigerant condensers and towers $3,821 $2,573 $2,638
53,836
kWh
$1,183
-
kW-mo/yr
- -
08 2.7241: Install outside air damper / economizer on hvac unit $18,835 $13,760 $18,835
384,384
kWh
- - -
09 2.3212: Optimize plant power factor $6,235 $11,638 - - $6,235 -
10 2.4322: Use or replace with energy efficient substitutes $11,228 $37,188 $8,545
174,380
kWh
$2,683
-
kW-mo/yr
- -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $3,371 $13,908 $2,515
51,317
kWh
$856
-
kW-mo/yr
- -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $11,570 $55,638 $8,967
183,006
kWh
$2,603
-
kW-mo/yr
- -
13 2.7142: Utilize higher efficiency lamps and/or ballasts $217 $1,073 $217
4,428
kWh
- - -
14 2.6232: Install set-back timers $6,234 $1,983 - - - $6,234
-
MMBtu
TOTAL RECOMMENDED $80,018 $149,510 $60,223
1,229,040
kWh
$7,325
-
kW-mo/yr
$6,235 $6,234
-
MMBtu
TOTAL IMPLEMENTED $46,137 $116,642 $38,811
792,070
kWh
$7,325
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs