Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

135

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Optical instrument and lens manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0624 #08 Y:2024 Level zero – install control systems for existing equipment $23,221 $60,000
UF0624 #07 Y:2024 Replace old machine with new automatic multi-station tool $38,400 $100,000
UF0624 #06 Y:2024 Upgrade controls on compressors $5,844 $6,000
UF0624 #05 Y:2024 Eliminate or reduce compressed air usage $8,280 -
UF0624 #04 Y:2024 Utilize controls to operate equipment only when needed $12,033 $25,340
UF0624 #03 Y:2024 Use battery storage for demand control $11,217 $21,658
UF0624 #02 Y:2024 Use fossil fuel powered generator during peak demand periods $20,908 $14,359
UF0624 #01 Y:2024 Use solar heat to make electricty $59,131 $322,608
LE0527 #07 Y:2022 Replace existing chiller with high efficiency model $16,154 $160,000
LE0527 #06 Y:2022 Use cooling tower or economizer to replace chiller cooling $2,260 $8,500
LE0527 #05 Y:2022 Replace existing hvac unit with high efficiency model $32,527 $500,000
LE0527 #04 Y:2022 Utilize higher efficiency lamps and/or ballasts $5,500 $3,435
LE0527 #03 Y:2022 Install timers and/or thermostats $2,621 $1,330
LE0527 #02 Y:2022 Reduce the pressure of compressed air to the minimum required $103 $40
LE0527 #01 Y:2022 Pay bills on time to avoid late fees $1,805 -
SU0499 #07 Y:2020 Conserve energy by efficient use of vending machines $345 $64
SU0499 #06 Y:2020 Utilize higher efficiency lamps and/or ballasts $15,223 $75,235
SU0499 #05 Y:2020 Eliminate/reduce an operation $6,889 $11,879
SU0499 #04 Y:2020 Install compressor air intakes in coolest locations $627 $999
SU0499 #03 Y:2020 Utilize higher efficiency lamps and/or ballasts $2,448 $4,525