ITAC Assessment: LE0527
ITAC logo
ITAC Assessment: LE0527
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Coated Glass Products
NAICS 333314: Optical Instrument and Lens Manufacturing
SIC 3827: Optical Instruments and Lenses
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 46,000
ft2
Annual Production 120,000
units
Production Hrs. Annual 2,600
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $244,865 2,689,400
kWh
Electricity Demand $38,003 5,511
kW-mo/yr
Electricity Fees $4,450 -
Natural Gas $4,540 357
MMBtu
TOTAL YEARLY COSTS $291,858
RECOMMENDED SAVINGS* $60,970 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,607

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Primary Product Savings
01 4.821: Pay bills on time to avoid late fees $1,805 - - - $1,805 -
02 2.4231: Reduce the pressure of compressed air to the minimum required $103 $40 $76
837
kWh
$27
-
kW-mo/yr
- -
03 2.7261: Install timers and/or thermostats $2,621 $1,330 $2,621
28,805
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,500 $3,435 $4,074
44,772
kWh
$1,426
-
kW-mo/yr
- -
05 2.7232: Replace existing hvac unit with high efficiency model $32,527 $500,000 $30,029
329,987
kWh
$2,498
-
kW-mo/yr
- -
06 2.2614: Use cooling tower or economizer to replace chiller cooling $2,260 $8,500 $1,760
19,336
kWh
$500
-
kW-mo/yr
- -
07 2.2622: Replace existing chiller with high efficiency model $16,154 $160,000 - - - $16,154
TOTAL RECOMMENDED $60,970 $673,305 $38,560
423,737
kWh
$4,451
-
kW-mo/yr
$1,805 $16,154
TOTAL IMPLEMENTED $58,607 $664,765 $36,724
403,564
kWh
$3,924
-
kW-mo/yr
$1,805 $16,154
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs