Assessment Year | 1995 |
---|---|
Principal Product | Recognition Awards |
NAICS |
n/a
|
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 65 |
Plant Area |
48,000
ft2
|
Annual Production | 57,200
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $45,466 | 630,422 |
kWh
|
$0.072 |
Natural Gas | $11,395 | 2,877 |
MMBtu
|
$3.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,300 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,802 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $100 | $200 |
$100
1,172
kWh
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $408 | $40 |
$408
5,569
kWh
|
- | |
03 | 2.2437: Recover waste heat from equipment | $404 | $600 | - |
$404
-
MMBtu
|
|
04 | 2.6214: Shut off pilots in standby equipment | $131 | $40 | - |
$131
-
MMBtu
|
|
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,150 | $1,030 |
$1,475
20,516
kWh
|
$(-325.0)
-
MMBtu
|
|
06 | 2.4133: Use most efficient type of electric motors | $1,662 | $4,470 |
$1,662
23,154
kWh
|
- | |
07 | 2.7135: Install occupancy sensors | $981 | $675 |
$981
13,482
kWh
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $438 | $472 |
$438
6,155
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $147 | $235 |
$147
2,052
kWh
|
- | |
10 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,879 | $2,250 | - |
$1,879
-
MMBtu
|
|
TOTAL RECOMMENDED | $7,300 | $10,012 |
$5,211
72,100
kWh
|
$2,089
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,802 | $4,197 |
$1,519
20,809
kWh
|
$2,283
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs