ITAC Assessment: BD0042
ITAC logo
ITAC Assessment: BD0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Recognition Awards
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 48,000
ft2
Annual Production 57,200
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,466 630,422
kWh
Natural Gas $11,395 2,877
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,300 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,802

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $100 $200 $100
1,172
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $408 $40 $408
5,569
kWh
-
03 2.2437: Recover waste heat from equipment $404 $600 - $404
-
MMBtu
04 2.6214: Shut off pilots in standby equipment $131 $40 - $131
-
MMBtu
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,150 $1,030 $1,475
20,516
kWh
$(-325.0)
-
MMBtu
06 2.4133: Use most efficient type of electric motors $1,662 $4,470 $1,662
23,154
kWh
-
07 2.7135: Install occupancy sensors $981 $675 $981
13,482
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $438 $472 $438
6,155
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $147 $235 $147
2,052
kWh
-
10 2.7447: Install vinyl strip / high speed / air curtain doors $1,879 $2,250 - $1,879
-
MMBtu
TOTAL RECOMMENDED $7,300 $10,012 $5,211
72,100
kWh
$2,089
-
MMBtu
TOTAL IMPLEMENTED $3,802 $4,197 $1,519
20,809
kWh
$2,283
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs