Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

513

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Commercial and service industry machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0460 #08 Y:2012 Reduce the pressure of compressed air to the minimum required $1,570 $200
SD0460 #07 Y:2012 Utilize higher efficiency lamps and/or ballasts $1,515 $3,212
SD0460 #06 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $3,847 $7,050
SD0460 #05 Y:2012 Replace boiler $4,735 $14,250
SD0460 #04 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $3,875 $900
SD0460 #03 Y:2012 Turn off equipment when not in use $11,357 $1,000
SD0460 #02 Y:2012 Clean or color roof to reduce solar load $48,502 $119,500
SD0460 #01 Y:2012 Replace existing hvac unit with high efficiency model $50,132 $152,300
SU0327 #04 Y:2012 Reduce ventilation air $2,247 $4,271
SU0327 #03 Y:2012 Install compressor air intakes in coolest locations $870 $858
SU0327 #02 Y:2012 Pay bills on time to avoid late fees $287 -
SU0327 #01 Y:2012 Utilize energy-efficient belts and other improved mechanisms $728 -
MI0220 #13 Y:2012 Turn off equipment when not in use $906 $208
MI0220 #12 Y:2012 Install skylights $978 $1,920
MI0220 #11 Y:2012 Utilize energy-efficient belts and other improved mechanisms $1,014 $320
MI0220 #10 Y:2012 Install partitions to reduce size of conditioned space $2,072 $5,800
MI0220 #09 Y:2012 Turn off equipment when not in use $2,772 $545
MI0220 #08 Y:2012 Utilize higher efficiency lamps and/or ballasts $3,863 $5,850
MI0220 #07 Y:2012 Lower temperature during the winter season and vice-versa $4,050 $200
MI0220 #06 Y:2012 Turn off equipment when not in use $5,329 $40