ITAC Assessment: SD0460
ITAC logo
ITAC Assessment: SD0460
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Laser Tables
NAICS 333314: Optical Instrument and Lens Manufacturing
SIC 3827: Optical Instruments and Lenses
Sales Range $500
k
to 1
M
# of Employees 400
Plant Area 213,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $591,880 7,517,592
kWh
Electricity Demand $194,013 16,461
kW-mo/yr
Natural Gas $45,644 6,411
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $127,513 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $69,180

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7232: Replace existing hvac unit with high efficiency model $50,132 $152,300 $40,555
512,322
kWh
$9,577
-
kW-mo/yr
-
02 2.7425: Clean or color roof to reduce solar load $48,502 $119,500 $48,502
616,291
kWh
- -
03 2.6218: Turn off equipment when not in use $11,357 $1,000 $11,357
282,505
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,875 $900 $2,334
29,661
kWh
$1,541
-
kW-mo/yr
-
05 2.1224: Replace boiler $4,735 $14,250 - - $4,735
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,847 $7,050 $3,847
48,878
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,515 $3,212 $1,257
15,977
kWh
$258
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,570 $200 $1,570
19,946
kWh
- -
09 2.7134: Use photocell controls $1,249 $1,100 $878
11,156
kWh
$371
-
kW-mo/yr
-
10 2.4133: Use most efficient type of electric motors $731 $2,500 $518
6,588
kWh
$213
-
kW-mo/yr
-
TOTAL RECOMMENDED $127,513 $302,012 $110,818
1,543,324
kWh
$11,960
-
kW-mo/yr
$4,735
-
MMBtu
TOTAL IMPLEMENTED $69,180 $160,112 $57,591
866,999
kWh
$11,589
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs