ITAC Assessment: GT0586
ITAC logo
ITAC Assessment: GT0586
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Packaging Supplies
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 168
Plant Area 170,000
ft2
Annual Production 18,641,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,751 4,357,269
kWh
Electricity Demand $160,706 10,223
kW-mo/yr
Electricity Fees $13,373 -
Natural Gas $57,438 9,687
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,706 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,485

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $4,450 $19,650 $1,924
78,546
kWh
$2,322
-
kW-mo/yr
$204 - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $670 $640 $294
12,016
kWh
$360
-
kW-mo/yr
$16 - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,300 $2,500 $9,119
372,216
kWh
$11,160
-
kW-mo/yr
$1,021 - -
04 2.2135: Repair and eliminate steam leaks $1,390 $900 - - - $1,390
-
MMBtu
-
05 2.4224: Upgrade controls on compressors $5,100 $5,200 $5,100
208,089
kWh
- - - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $20,711 $16,120 $22,934
936,108
kWh
$28,079
-
kW-mo/yr
- $(-30,302.0)
-
MMBtu
-
07 2.3132: Recharge batteries on during off-peak demand periods $1,060 - - $1,008
-
kW-mo/yr
$52 - -
08 3.5217: Reuse / recycle/ sell paper products $11,025 $4,850 - - - - $11,025
-
lb
TOTAL RECOMMENDED $65,706 $49,860 $39,371
1,606,975
kWh
$42,929
-
kW-mo/yr
$1,293 $(-28,912.0)
-
MMBtu
$11,025
-
lb
TOTAL IMPLEMENTED $39,485 $14,090 $14,513
592,321
kWh
$11,520
-
kW-mo/yr
$1,037 $1,390
-
MMBtu
$11,025
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs